Final | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/03/2002 at 09:31:26. Contact: ###-####.
|
Final | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/01/2002 at 11:47:37. Contact: ###-####. vent m.p. regulator to outdoors 4/2/2002 10:17:11 AM
|
Pressure Test | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 12:04:03. Contact: ###-####. high side pa 1/22/2002 11:01:07 AM s 1/22/2002 11:01:08 AMed low failed 1/22/2002 11:01:42 AM
|
Pressure Test | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 01/22/2002 at 11:20:16. Contact: ###-####.
|
Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 12:03:39. Contact: ###-####.
|
Pressure Test | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 08:43:23. Contact: ###-####.
|
Rough-in | 1/18/2002 | 1/18/2002 | 1/18/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 01/18/2002 at 08:42:51. Contact: ###-####. corrections posted 1/18/2002 2:17:56 PM
|