Final | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 5/10/2002 3:57:39 PM
|
Final | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 08:19:28. Contact: ###-####.
|
Pressure Test | 4/10/2002 | 4/11/2002 | 4/11/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 11:47:44. Contact: ###-####...by pennsylvania 4/11/2002 8:41:37 AM...#20 test into bldg ok 4/11/2002 11:29:07 AM
|
Pressure Test | 4/9/2002 | 4/10/2002 | 4/10/2002 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 13:23:20. Contact: ###-####.
|
Rough-in | 1/17/2002 | 1/18/2002 | 1/18/2002 | A | NR |
Alan Hauser
|
|
|
wanted plbg inspection 1/18/2002 9:09:45 AM
|