Final | 3/5/2002 | 3/6/2002 | 3/6/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 15:24:28. Contact: ###-####.
|
Rough-in | 2/6/2002 | 2/6/2002 | 2/6/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/06/2002 at 10:48:01. Contact: ###-####.
|
Pressure Test | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 15:55:10. Contact: ###-####.
|
Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 15:54:51. Contact: ###-####. bath exhaust to be 3' from open window 2/5/2002 10:23:51 AM
|