Final | 10/21/2002 | 10/22/2002 | 10/22/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 11:40:30. Contact: ###-####.
|
Final | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 16:59:27. Contact: ###-####. final for hvac in out building only 3/13/2002 10:04:19 AM
|
Final | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/11/2002 at 10:50:34. Contact: ###-####. cooper tube off condensate is smashed outside...wire a/c disconnect 3/11/2002 3:46:06 PM
|
Pressure Test | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/13/2002 at 14:02:40. Contact: ###-####.
|
Pressure Test | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/12/2002 at 17:12:53. Contact: ###-####. wrong size guage 2/13/2002 1:38:36 PM
|
Pressure Test | 2/4/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 02/04/2002 at 18:03:58. Contact: ###-####.
|
Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 15:42:49. Contact: ###-####.
|