Final | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Alan Hauser
|
|
|
fn jane- ###-####
|
Final | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Alan Hauser
|
|
|
c/n posted 3/8/2002 11:01:44 AM
|
Final | 3/8/2002 | 3/8/2002 | 3/8/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 3/8/2002 2:12:00 PM
|
Pressure Test | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PART |
Alan Hauser
|
|
|
pt ok, no gas piping sizing 2/11/2002 12:29:23 PM
|
Rough-in | 2/8/2002 | 2/11/2002 | 2/11/2002 | A | PART |
Alan Hauser
|
|
|
larger flex at rtu, and remove vent limiters at pressure reducing regulators 2/11/2002 12:28:54 PM
|
Pressure Test | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | FAIL |
Alan Hauser
|
|
|
no access to roof 2/8/2002 10:04:58 AM
|
Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | FAIL |
Alan Hauser
|
|
|
no access to roof 2/8/2002 10:04:45 AM
|