Final | 9/27/2002 | 9/27/2002 | 9/27/2002 | P | PASS |
Dave Hannah
|
|
|
|
Final | 9/20/2002 | 9/23/2002 | 9/23/2002 | A | NR |
Dixie Fellows
|
|
|
maple grove and mitchell 9/23/2002 1:31:19 PM range exhaust 9/24/2002 7:50:15 AM
|
Final | 8/26/2002 | 8/26/2002 | 8/26/2002 | P | NR |
Dave Hannah
|
|
|
9316 ready for final ###-#### THIS IS FOR 9320 ADDRESSES GOT MESSED UP THE NORTH HALF IS NOT READY SOUTH HALF IS OK 8/26/2002 1:16:10 PM
|
Pressure Test | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 2/8/2002 2:36:22 PM
|
Rough-in | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Dave Hannah
|
|
|
r/i leo ###-####
|