Final | 7/1/2002 | 7/2/2002 | 7/2/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 12:50:57. Contact: ###-####.
|
Final | 5/24/2002 | 5/28/2002 | 5/28/2002 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 12:42:47. Contact: ###-####. wrong permit called in 5/28/2002 1:25:07 PM
|
Final | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Jim Sly
|
|
|
###-#### BOB ###-#### BOB Should have been rough in insp........R/I aand P/T...OK. 2/21/2002 9:53:51 AM
|
Rough-in | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 02/21/2002 at 08:30:14. Contact: ###-####.
|
Rough-in | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 08:06:37. Contact: ###-####. posted corrections.. 2/19/2002 10:53:45 AM
|