Final | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 08:34:49. Contact: ###-####.
|
Pressure Test | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 16:40:15. Contact: ###-####. pt ok, no pipe sizing 2/21/2002 11:31:47 AM
|
Rough-in | 2/20/2002 | 2/21/2002 | 2/21/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 02/20/2002 at 16:39:59. Contact: ###-####.
|