Rough-in | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | PASS |
Dave Hannah
|
|
|
RUSS, THIS DID NOT HAVE A R/I INSPECTION FOR THE FURNACE ALSO THE PRESSURE TEST FAILED SO BOTH OF THESE NEED TO BE TAKEN CARE OF ...THANKS DARLA ( BECKY WITH Y M C ###-#### )note all that was done to furnace was orf changed from propane to nat gas gas comp sighed off pressure test 10/22/2002 9:18:15 AM
|
Final | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | FAIL |
Alan Hauser
|
|
|
pt failed again 2/15/2002 9:27:43 AM
|
Pressure Test | 2/13/2002 | 2/14/2002 | 2/14/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### BECKY
|