Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 15:26:52. Contact: ###-####.
|
Rough-in | 3/4/2002 | 3/5/2002 | 3/5/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 13:52:56. Contact: ###-####.
|
Pressure Test | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | DONE |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:21:24. Contact: ###-####.by 411. 2/28/2002 10:19:31 AM
|
Rough-in | 2/27/2002 | 2/28/2002 | 2/28/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/27/2002 at 16:21:02. Contact: ###-####. Prior c/n damper for fresh air installed and to be accessable. 2/28/2002 10:19:57 AM
|
Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 17:32:33. Contact: ###-####.
|
Rough-in | 2/25/2002 | 2/26/2002 | 2/26/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 02/25/2002 at 17:32:12. Contact: ###-####. posted corrections 2/26/2002 10:14:50 AM
|