Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 15:21:06. Contact: ###-####.--for access to front door lock box is 10956
|
Pressure Test | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:44:43. Contact: ###-####.
|
Rough-in | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 02/28/2002 at 09:44:00. Contact: ###-####.
|