Pressure Test | 3/6/2002 | 3/6/2002 | 3/6/2002 | P | PART |
Alan Hauser
|
|
|
pt by gas co., no sizing of pipe 3/6/2002 3:38:09 PM
|
Pressure Test | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/04/2002 at 09:55:43. Contact: ###-####.
|
Conference | 2/22/2002 | 2/25/2002 | 2/25/2002 | A | DONE |
Dave Hannah
|
|
|
dave -###-#### for conf location of gas line from meter to house 2/25/2002 10:50:35 AM
|