MEC-Aging Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 | | DONE |
Troy James
|
|
|
|
DOC - Permit Finaled | 9/21/2005 | 9/21/2005 | 9/21/2005 | A | PASS |
Troy James
|
|
|
|
MEC-Aging Inspection | 7/22/2005 | 7/22/2005 | 7/22/2005 | | PASS |
Troy James
|
|
|
|
MEC-Aging Inspection | 5/16/2005 | 5/16/2005 | 5/16/2005 | | CANC |
Troy James
|
|
|
|
MEC-Aging Inspection | 3/14/2005 | 3/14/2005 | 3/14/2005 | | CANC |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 10/11/2004 | 10/11/2004 | 10/11/2004 | | NR |
Tom Arcoraci
|
|
|
|
Rough-in | 8/10/2004 | 8/11/2004 | 8/11/2004 | A | PART |
Alan Hauser
|
|
|
2nd flr. main area ok for tile 8/11/2004 1:07:01 PM
|
Rough-in | 8/3/2004 | 8/4/2004 | 8/4/2004 | A | PART |
Alan Hauser
|
|
|
first floor terminal ok for tile 8/4/2004 11:54:45 AM
|
Rough-in | 6/17/2004 | 6/21/2004 | 6/21/2004 | A | PART |
Alan Hauser
|
|
|
walk through with brad, duct ok in hard ceiling area at walkway to planes 6/21/2004 12:36:04 PM
|
Rough-in | 5/18/2004 | 5/19/2004 | 5/19/2004 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 5/18/2004 at 11:34:35 AM. Contact: ###-####.
|
Rough-in | 4/6/2004 | 4/7/2004 | 4/7/2004 | A | PART |
Alan Hauser
|
|
|
brad; Phone #: ###-#### general walk through with brad, looked at duct up at this point, ok 4/7/2004 10:50:40 AM
|
MEC-Aging Inspection | 11/17/2003 | 11/17/2003 | 11/17/2003 | | CANC |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 9/16/2003 | 9/16/2003 | 9/16/2003 | | CANC |
Alan Hauser
|
|
|
|
MEC-Aging Inspection | 7/17/2003 | 7/17/2003 | 7/17/2003 | | CANC |
Alan Hauser
|
|
|
|
Final | 5/13/2003 | 5/16/2003 | 5/16/2003 | A | PART |
Alan Hauser
|
|
|
###-#### Brad partial final for terminal ok, need gas permit final, then sign temporary card on monday 5/16/2003 10:32:35 PM
|
Rough-in | 4/22/2003 | 4/28/2003 | 4/28/2003 | A | PART |
Alan Hauser
|
|
|
###-#### martha
|
Rough-in | 3/26/2003 | 3/31/2003 | 3/31/2003 | A | PART |
Alan Hauser
|
|
|
was walk through all floors 3/31/2003 8:31:46 PM
|
Rough-in | 3/18/2003 | 3/20/2003 | 3/20/2003 | A | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/18/2003 at 10:31:18 AM. Contact: ###-####.
|
Rough-in | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | PART |
Alan Hauser
|
|
|
walk thru 3/3/2003 11:31:44 PM
|
Rough-in | 2/12/2003 | 2/18/2003 | 2/18/2003 | A | PART |
Alan Hauser
|
|
|
walk thru for diff. hook up, on 1st and 2nd floor 2/18/2003 9:41:17 PM
|
Rough-in | 2/3/2003 | 2/3/2003 | 2/3/2003 | P | PART |
Alan Hauser
|
|
|
walk thru with brad 2/4/2003 2:22:23 AM
|
Rough-in | 12/13/2002 | 12/13/2002 | 12/13/2002 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 12/13/2002 at 08:34:03. Contact: ###-####.\\ALSO FINAL TEMP FOR THE WALKWAY
|
Rough-in | 10/11/2002 | 10/14/2002 | 10/14/2002 | A | PART |
Alan Hauser
|
|
|
BATHROOM REMODEL IN OLD AIRPORT CONCOURSE 10/14/2002 4:22:22 PM
|
Rough-in | 8/13/2002 | 8/15/2002 | 8/15/2002 | A | PART |
Alan Hauser
|
|
|
walk through with brad, no areas to be covered yet 8/15/2002 11:04:15 AM
|
Conference | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 5/22/2002 10:59:29 AM
|
Rough-in | 5/13/2002 | 5/13/2002 | 5/13/2002 | P | PART |
Alan Hauser
|
|
|
just went over plans 5/13/2002 4:24:35 PM
|