Final | 6/26/2002 | 6/27/2002 | 6/27/2002 | A | PASS |
Alan Hauser
|
|
|
chris- ###-#### -re-insp fn
|
Final | 5/23/2002 | 5/24/2002 | 5/24/2002 | A | FAIL |
Alan Hauser
|
|
|
seperate overflow and primary drains 5/24/2002 11:08:45 AM
|
Rough-in | 4/10/2002 | 4/11/2002 | 4/11/2002 | A | PASS |
Steven Webb
|
|
|
###-#### chris
|
Rough-in | 4/8/2002 | 4/10/2002 | 4/10/2002 | A | NR |
Dave Lightfoot
|
|
|
###-#### CHRIS
|
Rough-in | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | NR |
Dave Lightfoot
|
|
|
###-#### CHRIS
|
Pressure Test | 2/25/2002 | 2/26/2002 | 2/26/2002 | P | FAIL |
Alan Hauser
|
|
|
pres test -pat or deanne ###-#### pt failed 2/26/2002 1:23:48 PM
|