Final | 4/16/2002 | 4/17/2002 | 4/17/2002 | P | PASS |
Tony Young
|
|
|
###-####
|
Pressure Test | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Rough-in | 3/4/2002 | 3/4/2002 | 3/4/2002 | P | CANC |
Dixie Fellows
|
|
|
###-#### already done 3/4/2002 2:48:40 PM
|
Conference | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/28/2002 6:03:07 PM 8693120 w/ contractor re sealing supply duct...use mastic or foil tape. 3/1/2002 11:17:12 AM
|
Pressure Test | 2/28/2002 | 3/1/2002 | 3/1/2002 | A | FAIL |
Alan Hauser
|
|
|
gage on zero 3/1/2002 9:29:40 AM
|
Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | FAIL |
Carl Dependahl
|
|
|
todd ###-#### r/i ..need permanent sealant for supply duct at r/a; failed p.t. 3/1/2002 11:15:37 AM
|