Final | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/01/2002 at 15:24:13. Contact: ###-####.
|
Pressure Test | 3/7/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 17:00:28. Contact: ###-####.
|
Rough-in | 3/7/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 17:00:08. Contact: ###-####.
|