Final | 3/19/2002 | 3/20/2002 | 3/20/2002 | A | FAIL |
Tony Young
|
|
|
bob ###-#### re-insp for f/p
|
Final | 3/5/2002 | 3/14/2002 | 3/14/2002 | P | FAIL |
Alan Hauser
|
|
|
finish framing at fire place and recall for inspection, left c/n 3/14/2002 2:41:55 PM
|
Pressure Test | 3/5/2002 | 3/11/2002 | 3/11/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/05/2002 at 14:10:51. Contact: ###-####. done by int gas...equipment under different permit 3/11/2002 4:40:56 PM
|
Pressure Test | 3/4/2002 | 3/5/2002 | 3/5/2002 | P | NR |
Dixie Fellows
|
|
|
###-#### A-1 they will reschedule for monday 3/5/2002 5:40:08 PM
|