Final | 4/9/2002 | 4/10/2002 | 4/10/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 04/09/2002 at 16:31:34. Contact: ###-####.
|
Pressure Test | 3/13/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 3/13/2002 10:16:06 AM
|
Rough-in | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 14:12:37. Contact: ###-####.
|