Final | 5/29/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 13:41:56. Contact: ###-####.
|
Final | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | FAIL |
Alan Hauser
|
|
|
wanted r/i 1st floor, r/i ok 3/14/2002 1:57:21 PM
|
Rough-in | 3/7/2002 | 3/7/2002 | 3/7/2002 | P | PART |
Alan Hauser
|
|
|
2nd floor loft area only 3/7/2002 2:14:07 PM
|