Rough-in | 3/8/2002 | 3/11/2002 | 3/11/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 15:03:35. Contact: ###-####.
|
Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 13:19:06. Contact: ###-####. secure f/p with side tabs 3/8/2002 5:15:45 PM
|
Rough-in | 3/7/2002 | 3/11/2002 | 3/7/2002 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/07/2002 at 13:16:23. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/07/2002 at 13:18:20.
|
Final | 3/5/2002 | 3/7/2002 | 3/7/2002 | P | NR |
Dixie Fellows
|
|
|
###-#### no f/p installed yet 3/7/2002 3:27:00 PM
|