Final | 8/27/2002 | 8/27/2002 | 8/27/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 10:27:22. Contact: ###-####.
|
Final | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 09:28:24. Contact: ###-####. Scheduled by a wrong insp type added r/i no gas piping.contractor via Hello! on 04/29/2002 at 09:28:24. Contact: ###-####. 4/29/2002 4:33:53 PM
|
Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PART |
Jim Storey
|
|
|
vent fans ducts and return air ok no gas piping.
|
Rough-in | 3/11/2002 | 3/11/2002 | 3/11/2002 | P | PART |
Alan Hauser
|
|
|
underground only duct looked at, to be encased in concrete 3/11/2002 2:23:59 PM
|