DOC - Permit Finaled | | | 10/22/2002 | | DONE |
|
|
|
|
Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/11/2002 at 16:39:27. Contact: ###-####.
|
Rough-in | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 03/13/2002 at 15:01:25. Contact: ###-####.
|
Pressure Test | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 08:55:09. Contact: ###-####.
|
Rough-in | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 08:54:52. Contact: ###-####. c/n posted 3/13/2002 11:45:59 AM
|