Final | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/05/2002 at 11:54:22. Contact: ###-####.
|
Final | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/04/2002 at 15:27:06. Contact: ###-####. C/N posted--Vent termination within 8' of vertical wall--needs to extend at least 2' above this wall. 6/5/2002 10:13:27 AM
|
Pressure Test | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 09:44:34. Contact: ###-####.
|
Rough-in | 3/14/2002 | 3/14/2002 | 3/14/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/14/2002 at 09:43:55. Contact: ###-####.
|