Final | 6/3/2002 | 6/3/2002 | 6/3/2002 | A | PASS |
Dixie Fellows
|
|
|
|
Final | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 10:45:55. Contact: ###-####. will final with tml permit when exhaust fan installed..talked to cont 5/8/2002 3:15:01 PM
|
Pressure Test | 3/13/2002 | 3/14/2002 | 3/14/2002 | A | PASS |
Alan Hauser
|
|
|
pressure test on all mainline, no rtu or hook ups yet 3/14/2002 10:02:20 AM
|
Pressure Test | 3/12/2002 | 3/13/2002 | 3/13/2002 | A | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 16:49:04. Contact: ###-####. need gas plans 3/13/2002 11:45:41 AM
|
Pressure Test | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | FAIL |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 10:13:37. Contact: ###-####. need plan for gas pipe change 3/12/2002 12:33:35 PM
|
Pressure Test | 3/8/2002 | 3/12/2002 | 3/11/2002 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/08/2002 at 14:59:02. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 03/11/2002 at 16:23:22.
|