Final | 3/19/2002 | 3/20/2002 | 3/20/2002 | A | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/19/2002 at 12:17:16. Contact: ###-####. This is in the same state of installation as with the r-i inspection. This appliance should be complete for a final, all trim installed and ready for operation. 3/20/2002 1:08:19 PM a final 3/20/2002 1:08:24 PM 3/20/2002 1:08:54 PM
|
Final | 3/12/2002 | 3/12/2002 | 3/12/2002 | P | PASS |
Dave Lightfoot
|
|
|
Scheduled by a contractor via Hello! on 03/12/2002 at 09:03:25. Contact: ###-####.
|