Final | 5/7/2002 | 5/9/2002 | 5/9/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 15:47:50. Contact: ###-####.
|
Final | 4/30/2002 | 4/30/2002 | 4/30/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 07:56:58. Contact: ###-####. no card on site..no super on site...called ben 4/30/2002 4:04:10 PM
|
Rough-in | 4/5/2002 | 4/8/2002 | 4/8/2002 | A | PASS |
Dixie Fellows
|
|
|
roof top units\###-#### Ben roof top units ok...all regs and exhaust ok 4/8/2002 11:24:37 AM
|
Rough-in | 4/2/2002 | 4/3/2002 | 4/3/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/02/2002 at 10:57:12. Contact: ###-####.
|
Rough-in | 3/14/2002 | 3/15/2002 | 3/15/2002 | A | PART |
Russ Owen
|
|
|
r/i ben frisbee ###-#### about 80% complete most all work will be exposed.Told them to call when completed for re-inspection. 3/15/2002 1:05:24 PM
|