Final | 8/27/2002 | 8/28/2002 | 8/28/2002 | A | PASS |
Dave Hannah
|
|
|
scott blades (maint manager)or Chris w/ TML ###-####; Phone #: ###-#### Internet Inspection Request from: Michelle Evans
|
Final | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 09:09:51. Contact: ###-####. chris called 4/26/2002 2:39:40 PM
|
Final | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 11:12:01. Contact: ###-####....orchard left on malad 4/25/2002 12:33:09 PM insulate metal in garage..complete supply in bath...no cards in site 4/25/2002 2:39:09 PM
|
Rough-in | 3/26/2002 | 3/26/2002 | 3/26/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 10:23:04. Contact: ###-####.
|
Pressure Test | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 16:31:10. Contact: ###-####.
|
Rough-in | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 16:30:58. Contact: ###-####....ok to cover ceiling.....will check metal bands on next insp 3/25/2002 2:56:09 PM
|
Rough-in | 3/22/2002 | 3/22/2002 | 3/22/2002 | P | FAIL |
Alan Hauser
|
|
|
c/n posted at interior window 3/22/2002 2:54:10 PM
|