Final | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 15:47:12. Contact: ###-####.
|
Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 12:22:15. Contact: ###-####.
|
Rough-in | 3/26/2002 | 3/27/2002 | 3/27/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/26/2002 at 12:18:08. Contact: ###-####. gas test failed c/n. 3/27/2002 12:20:28 PM
|