Final | 12/2/2002 | 12/3/2002 | 12/3/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 14:23:55. Contact: ###-####. one of the doors on the main level will be open c/n item completed 12/3/2002 10:44:36 AM
|
Final | 11/27/2002 | 12/2/2002 | 12/2/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 11:48:05. Contact: ###-####.---front door unlocked at 8;00 C/N posted--need shut off on fireplace on 2nd floor. Placed sticker on furnace. 12/2/2002 8:55:20 AM
|
Pressure Test | 10/1/2002 | 10/2/2002 | 10/2/2002 | A | PASS |
Tony Young
|
|
|
LOST TAG ###-####
no test, just put new tag on 10/2/2002 11:41:33 AM
|
Pressure Test | 9/5/2002 | 9/6/2002 | 9/6/2002 | A | PASS |
Dave Hannah
|
|
|
this should have been done on 9-4-02 ??? piping from garage to meter 9/6/2002 9:17:07 AM
|
Pressure Test | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 13:31:43. Contact: ###-####. for house only not for garage
|
Rough-in | 8/9/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/09/2002 at 13:31:20. Contact: ###-####. only for main house and not for garage
|
Rough-in | 4/26/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 10:27:02. Contact: ###-####. gas failed..r/i on main house failed..posted corrections..studio above garage not ready 4/26/2002 3:19:52 PM
|
Pressure Test | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 10:57:31. Contact: ###-####.
|
Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | NR |
Jim Storey
|
|
|
###-####
|