Final | 6/13/2002 | 6/14/2002 | 6/14/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/13/2002 at 16:49:35. Contact: ###-####.
|
Final | 6/13/2002 | 6/13/2002 | 6/13/2002 | P | FAIL |
Alan Hauser
|
|
|
extend b-vent at water heater to maintain 18" clearance to single wall flue 6/13/2002 12:29:48 PM
|
Rough-in | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | PART |
Alan Hauser
|
|
|
above grid ok, not done on roof 5/28/2002 2:10:12 PM
|
Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | FAIL |
Alan Hauser
|
|
|
support flex with metal, is dishwasher duct ot be aluminum? 5/21/2002 10:32:22 AM
|