Final | 4/11/2002 | 4/12/2002 | 4/12/2002 | A | PASS |
Dixie Fellows
|
|
|
go to the door ###-####
|
Final | 4/10/2002 | 4/11/2002 | 4/11/2002 | A | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/10/2002 at 12:27:22. Contact: . called marrion at 10:00..got answering machine 4/11/2002 10:13:57 AM
|
Final | 4/8/2002 | 4/9/2002 | 4/9/2002 | A | NH |
Dave Lightfoot
|
|
|
MARRION ###-####
|
Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | FAIL |
Steven Webb
|
|
|
debbie- ###-#### fn Rough-In ok but not ready for final--unit not even set in opening. 4/5/2002 3:32:32 PM
|
Pressure Test | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Steven Webb
|
|
|
pres test- debbie- ###-####
|