Final | 5/28/2002 | 5/28/2002 | 5/28/2002 | P | PASS |
Dixie Fellows
|
|
|
###-#### SHAWNA
|
Final | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | FAIL |
Dixie Fellows
|
|
|
sandy- ###-#### fn code for gate is 2684 complete gas to w/h...overflow drains to terminate outside of crawl 5/21/2002 3:35:35 PM
|
Pressure Test | 4/16/2002 | 4/16/2002 | 4/16/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/16/2002 at 08:49:06. Contact: ###-####.
|
Pressure Test | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:19. Contact: ###-####. waiting on corey with info about gas line and btu load 4/12/2002 7:10:18 PM
|
Rough-in | 4/12/2002 | 4/12/2002 | 4/12/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/12/2002 at 10:20:41. Contact: ###-####. already done 4/12/2002 7:10:25 PM
|
Pressure Test | 4/10/2002 | 4/11/2002 | 4/11/2002 | A | FAIL |
Dixie Fellows
|
|
|
r/i ok.. 4/11/2002 2:07:33 PM
|
Rough-in | 4/10/2002 | 4/11/2002 | 4/10/2002 | A | CANC |
Dixie Fellows
|
|
|
code *2684 \\###-####
|