Final | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PASS |
Jim Storey
|
|
|
###-#### key above front door c/n made ok final ok 6/5/2002 9:01:47 AM
|
Final | 6/2/2002 | 6/3/2002 | 6/3/2002 | P | FAIL |
Alan Hauser
|
|
|
locked 6/3/2002 2:29:43 PM
|
Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 18:16:02. Contact: ###-####.
|
Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 04/15/2002 at 08:22:37. Contact: ###-####.
|
Pressure Test | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | PASS |
Jim Storey
|
|
|
shane ###-#### gas test only ok 4/11/2002 4:24:53 PM
|
Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | FAIL |
Jim Storey
|
|
|
###-#### shane
|