Conference | 11/13/2002 | 11/14/2002 | 11/14/2002 | A | PASS |
Dixie Fellows
|
|
|
this has a pass final please doc. final thanks linda Internet Inspection Request from: Linda Hartwell
|
Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Dave Hannah
|
|
|
curtian ###-#### this is for 3197 only 5/9/2002 3:09:16 PM
|
Pressure Test | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | PASS |
Dave Hannah
|
|
|
curtian ###-#### this is for 3197 only 5/9/2002 3:08:55 PM
|
Final | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 07:37:23. Contact: ###-####. called carol 5/8/2002 5:47:45 PM
|
Pressure Test | 5/8/2002 | 5/8/2002 | 5/8/2002 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/08/2002 at 07:37:34. Contact: ###-####. called carol 5/8/2002 5:47:55 PM
|
Rough-in | 5/6/2002 | 5/7/2002 | 5/7/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/06/2002 at 14:27:08. Contact: ###-####.
|
Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PASS |
Dixie Fellows
|
|
|
THIS IS FOR 3199 ONLY ###-#### APRIL
|
Conference | 4/25/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 10:53:40. Contact: ###-####.
ok to run B vent up through 2 storys providing clearances and fire blocks, also there is not enouph vents for crawl space, therefore new vent for fresh and combustion will be added,///5' roof clearance/ separation not needed due to just a duplex w/ no property line 4/29/2002 9:53:27 AM
|