Pressure Test | 4/22/2002 | 4/23/2002 | 4/23/2002 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/22/2002 at 13:23:22. Contact: ###-####.
|
Rough-in | 4/23/2002 | 4/23/2002 | 4/23/2002 | A | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 4/23/2002 9:04:31 AM
|
Final | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 16:57:15. Contact: ###-####.no power to hood 4/22/2002 10:01:51 AM
|
Pressure Test | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/19/2002 at 16:57:29. Contact: ###-####. below 20psi down to about 10 4/22/2002 10:02:39 AM
|