DOC - Permit Finaled | | | 12/11/2002 | | DONE |
|
|
|
|
Final | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 10:47:00. Contact: ###-####.
|
Rough-in | 4/26/2002 | 4/29/2002 | 4/29/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/26/2002 at 15:16:58. Contact: ###-####.
|
Pressure Test | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:01:25. Contact: ###-####.
|
Rough-in | 4/25/2002 | 4/26/2002 | 4/26/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 15:01:10. Contact: ###-####. bath exhaust to be pulled up off rafters and strapped every 4' vertically 4/26/2002 1:11:42 PM
|