Final | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 08:20:39. Contact: ###-####.
|
Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/25/2002 at 06:17:05. Contact: .
|
Pressure Test | 4/24/2002 | 4/24/2002 | 4/24/2002 | P | PART |
Alan Hauser
|
|
|
###-#### SAM pt ok, no sizing of pipe 4/24/2002 2:43:01 PM
|