Final | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/24/2002 at 11:02:25. Contact: ###-####. 60# pressure test OK. 5/24/2002 3:00:41 PM
|
Pressure Test | 5/14/2002 | 5/15/2002 | 5/15/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/14/2002 at 16:56:22. Contact: ###-####.
|
Pressure Test | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | FAIL |
Dixie Fellows
|
|
|
BOB ###-#### OR ###-#### no guage..need 60#test on line to f/w 4/22/2002 5:16:04 PM
|
Rough-in | 4/22/2002 | 4/22/2002 | 4/22/2002 | P | FAIL |
Dixie Fellows
|
|
|
BOB ###-#### OR ###-#### .....###-#### 4/22/2002 12:56:51 PM need regs vented outside in metal... 4/22/2002 5:15:41 PM
|