Final | 9/23/2002 | 9/24/2002 | 9/24/2002 | A | CANC |
Alan Hauser
|
|
|
will do in pm with final for gas piping 9/24/2002 1:58:16 PM
|
Final | 9/24/2002 | 9/24/2002 | 9/24/2002 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | FAIL |
Alan Hauser
|
|
|
wrong permit number, talked to ron about needing a new mec. permit for t.i. space, also need metal support straps at flex duct 8/15/2002 2:14:31 PM
|
Rough-in | 6/28/2002 | 6/28/2002 | 6/28/2002 | P | PART |
Alan Hauser
|
|
|
entrance ok for cover, only area looked at, no one on site 6/28/2002 1:50:57 PM
|
Rough-in | 6/11/2002 | 6/11/2002 | 6/11/2002 | P | PART |
Alan Hauser
|
|
|
bath rooms only 6/11/2002 3:54:17 PM
|