Final | 6/25/2002 | 6/25/2002 | 6/25/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/25/2002 at 10:34:27. Contact: ###-####.
|
Pressure Test | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PASS |
Dave Hannah
|
|
|
Added by Inspector: 425 On 4/29/2002 1:45:19 PM
|
Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 09:11:53. Contact: .
|