Final | 7/30/2002 | 7/30/2002 | 7/30/2002 | P | PASS |
Russ Owen
|
|
|
randy ###-####sticker allrready on unit by 411. also a pass entered. 7/30/2002 1:27:55 PM
|
Final | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | PASS |
Dixie Fellows
|
|
|
randy-- ###-#### fn ..off amity 7/24/2002 7:20:19 AM
|
Final | 7/24/2002 | 7/24/2002 | 7/24/2002 | A | FAIL |
Dixie Fellows
|
|
|
need 2nd drain at 2nd floor furn..upper comb 12" from ceiling..finish wiring equip..called randy 7/24/2002 11:18:33 AM
|
Pressure Test | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Alan Hauser
|
|
|
###-#### RANDY
|
Pressure Test | 5/2/2002 | 5/2/2002 | 5/2/2002 | P | PART |
Alan Hauser
|
|
|
pt ok, no pipe sizing 5/2/2002 2:53:13 PM
|
Pressure Test | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | NR |
Alan Hauser
|
|
|
finish piping 5/1/2002 12:28:50 PM
|
Pressure Test | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### on 0 5/1/2002 11:09:31 AM
|
Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
Rough-in | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | NR |
Alan Hauser
|
|
|
Scheduled by Inspector: 350 On 4/30/2002 2:14:45 PM
|
Pressure Test | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | NR |
Alan Hauser
|
|
|
randy ###-#### pres test
|
Rough-in | 4/29/2002 | 4/30/2002 | 4/30/2002 | P | NR |
Alan Hauser
|
|
|
randy ###-####
|