DOC - Permit Finaled | | | 1/8/2003 | | DONE |
|
|
|
|
Final | 6/17/2002 | 6/18/2002 | 6/18/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 12:42:37. Contact: ###-####. already done 6/18/2002 10:57:14 AM
|
Final | 6/7/2002 | 6/7/2002 | 6/7/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 11:03:45. Contact: ###-####.
|
Pressure Test | 5/10/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 14:29:13. Contact: ###-####.
|
Rough-in | 5/10/2002 | 5/13/2002 | 5/13/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 14:29:00. Contact: ###-####.
|