Final | 6/6/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 17:24:53. Contact: ###-####. done by 407 6/7/2002 10:03:10 AM
|
Final | 6/7/2002 | 6/6/2002 | 6/6/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/7/2002 8:00:57 AM
|
Final | 5/30/2002 | 5/31/2002 | 5/31/2002 | A | PART |
Dixie Fellows
|
|
|
###-#### BRUCE PLEASE CALL TO MEET HIM need disconnect at furn and pan r/a plenums with metal 5/31/2002 10:20:20 AM
|
Rough-in | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Dixie Fellows
|
|
|
call 1/2 hr prior ###-#### to meet there
|