Final | 8/1/2002 | 8/2/2002 | 8/2/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 08/01/2002 at 11:32:24. Contact: ###-####.
|
Final | 7/9/2002 | 7/10/2002 | 7/10/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 07/09/2002 at 13:39:35. Contact: ###-####.
|
Rough-in | 6/27/2002 | 6/28/2002 | 6/28/2002 | A | PART |
Alan Hauser
|
|
|
ADMIN ONLY ###-#### JOHN MCBRIDE this area ok for cover with tile 6/28/2002 11:09:30 AM
|
Rough-in | 6/11/2002 | 6/12/2002 | 6/12/2002 | A | PART |
Alan Hauser
|
|
|
ADMIN. BATHROOM JOHN ###-#### ok for cover 6/12/2002 10:38:07 AM
|
Rough-in | 5/9/2002 | 5/10/2002 | 5/10/2002 | A | PART |
Alan Hauser
|
|
|
meet with three foremans for hobson, looked at smoke/fire dampers as installed, all appeared ok, except one on third flr. south-east corner, motor cut into wall. not all installed 5/10/2002 12:28:49 PM
|