Final | 6/7/2002 | 6/7/2002 | 6/7/2002 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 06/07/2002 at 06:52:48. Contact: ###-####.
|
Final | 6/6/2002 | 6/6/2002 | 6/6/2002 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 06/06/2002 at 09:19:12. Contact: ###-####. maintane 6 inches min. from air filter from single wall flue duct. 6/6/2002 3:42:11 PM
|
Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/07/2002 at 09:23:15. Contact: ###-####.
|
Pressure Test | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | PASS |
Alan Hauser
|
|
|
ADVANCED HEATING ###-####
|
Rough-in | 5/6/2002 | 5/6/2002 | 5/6/2002 | P | FAIL |
Alan Hauser
|
|
|
need 1" clearance at roof sheathing penetration 5/6/2002 1:26:16 PM
|