Final | 12/31/2002 | 1/2/2003 | 1/2/2003 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/31/2002 at 13:19:19. Contact: ###-####.
|
Final | 12/30/2002 | 12/31/2002 | 12/31/2002 | A | FAIL |
Dixie Fellows
|
|
|
PLEASE GO BETWEEN 8:00 OR 8:30 DIXIE b-vent to be 2' higher than vert wall within 8' 12/31/2002 8:54:06 AM
|
Final | 12/27/2002 | 12/30/2002 | 12/30/2002 | A | CANC |
Dave Lightfoot
|
|
|
fn for homeowner- pete- ###-####--per dixie 8 & 8:30?\\DAVE THOUGHT PERMIT WAS EXPIRED. WILL RESEND TO DIXIE
|
Pressure Test | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | PASS |
Dixie Fellows
|
|
|
###-#### sharon 60# test to pool equip ok 5/29/2002 11:39:47 AM
|
Rough-in | 5/13/2002 | 5/14/2002 | 5/14/2002 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/13/2002 at 12:05:45. Contact: ###-####. will do on main gas line inspection 5/14/2002 5:25:51 PM
|
Pressure Test | 5/10/2002 | 5/13/2002 | 5/13/2002 | A | FAIL |
Dixie Fellows
|
|
|
don ###-#### main line into house leaking
#60 test 5/13/2002 10:57:05 AM
|
Pressure Test | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 10:34:10. Contact: ###-####. do 60" into house mon am...may be leaking 5/10/2002 3:06:24 PM
|
Rough-in | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/10/2002 at 10:33:43. Contact: ###-####.
|
Pressure Test | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 10:02:49. Contact: ###-####. med press failed..need to meet cont on job 5/9/2002 4:01:25 PM
|
Rough-in | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 05/09/2002 at 10:02:18. Contact: ###-####.
|
Pressure Test | 5/7/2002 | 5/8/2002 | 5/8/2002 | A | NR |
Dixie Fellows
|
|
|
###-#### ken
|