Final | 6/5/2002 | 6/6/2002 | 6/6/2002 | A | PASS |
Alan Hauser
|
|
|
alan- ###-#### fn
|
Final | 5/28/2002 | 5/29/2002 | 5/29/2002 | A | NR |
Alan Hauser
|
|
|
waiting to hear back, if a straight elbow is allowed in gas piping 5/29/2002 11:25:41 AM
|
Pressure Test | 5/23/2002 | 5/23/2002 | 5/23/2002 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 05/23/2002 at 08:04:01. Contact: ###-####.
|
Pressure Test | 5/10/2002 | 5/10/2002 | 5/10/2002 | P | FAIL |
Alan Hauser
|
|
|
changed from plans, need as built drawings, approved by engineer 5/10/2002 3:19:15 PM
|