Final | 6/21/2002 | 6/21/2002 | 6/21/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/21/2002 at 11:04:46. Contact: ###-####.
|
Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 06:54:10. Contact: ###-####. Heating rough-in ok but pressure test failed-6 lbs on guage at time of inspection. 5/21/2002 8:49:53 AM
|
Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/21/2002 at 09:59:43. Contact: ###-####. Pressure test -- passed. 5/21/2002 1:20:22 PM
|