Final | 2/25/2003 | 2/26/2003 | 2/26/2003 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/25/2003 at 3:58:32 PM. Contact: ###-####.
|
Final | 2/14/2003 | 2/14/2003 | 2/14/2003 | A | FAIL |
Alan Hauser
|
|
|
hvac ok, need to finish t/p drain lines from all water heaters, plb'r to have finished by monday 2/14/2003 7:53:05 PM
|
Pressure Test | 10/9/2002 | 10/10/2002 | 10/10/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/09/2002 at 09:30:10. Contact: ###-####....off 36th 10/10/2002 7:20:15 AM leak..need btu load..wrap all joints..fill in under pipe with dirt 10/10/2002 8:09:52 AM
|
Pressure Test | 10/10/2002 | 10/10/2002 | 10/10/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/10/2002 at 08:06:24. Contact: ###-####. gas to jacuzzi..bbq...ok 10/10/2002 2:42:37 PM
|
Pressure Test | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 16:40:53. Contact: ###-####.
|
Rough-in | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 16:40:41. Contact: ###-####.
|