Final | 10/24/2002 | 10/25/2002 | 10/25/2002 | P | PASS |
Dixie Fellows
|
|
|
greg ###-####
|
Final | 10/21/2002 | 10/22/2002 | 10/22/2002 | A | FAIL |
Dixie Fellows
|
|
|
###-#### DOORS LOCKED...CALLED BJ 10/22/2002 10:37:55 AM
|
Final | 10/22/2002 | 10/22/2002 | 10/22/2002 | P | NR |
Tony Young
|
|
|
###-#### bj
need to seal boots, etc. 10/22/2002 4:36:43 PM
|
Final | 10/12/2002 | 10/15/2002 | 10/15/2002 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/12/2002 at 08:47:00. Contact: ###-####. no address posted 10/15/2002 11:19:09 AM
|
Pressure Test | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PASS |
Alan Hauser
|
|
|
bj ###-#### pres test
|
Rough-in | 6/18/2002 | 6/19/2002 | 6/19/2002 | A | PASS |
Alan Hauser
|
|
|
r/i bj ###-####
|
Rough-in | 5/17/2002 | 5/17/2002 | 5/17/2002 | P | FAIL |
Tom Arcoraci
|
|
|
bj ###-#### r/i dryer vent exceeds 14 ft 5/20/2002 7:37:08 AM
|